Rodriguez Roofing
1421 Elm St, Meridian, ID
- Install date
- Thu, Aug 27
- Trades
- Roof, gutters
- Site contact
- Dana (homeowner)
- Link expires
- Sep 3
Scope of work
Full tear-off to decking. Replace any decking that fails inspection. Synthetic underlayment throughout, ice-and-water at all eaves and valleys, new drip edge, starter course, architectural shingles, ridge vent, and 6 new pipe boots. Re-hang existing gutters. Magnet-roll the entire property twice before leaving.
Measurements
- Total squares
- 34.5
- Predominant pitch
- 6/12
- Ridge
- 62 LF
- Hip
- 48 LF
- Valley
- 36 LF
- Eave
- 154 LF
- Rake
- 88 LF
- Waste factor
- 12%
Material list
- 38 sq architectural shingles — Weathered Wood
- 12 rolls synthetic underlayment
- 160 LF drip edge, 2 in. x 2 in.
- 62 LF ridge vent + ridge cap
- 6 pipe boots, 3 in.
Upload photos
Milestones
Note to office
Sample link. Pricing, claim details, and every other job stay invisible here.